Concrete Scope of Work Template

Foundations, flatwork, and driveways. Define the mix design, reinforcement, and finishing standards to ensure a solid base for your project.

Scope Builder

Click any text to edit. Add or remove items to customize for your project.

Concrete Scope of Work

CSI Division: 03 30 00

From (General Contractor)

To (Subcontractor)

Project Details

Project Narrative / Overview

1. General Requirements

  • Provide all labor, materials, forming, placing, and finishing of concrete.
  • Coordinate inspections for forms and reinforcement prior to pouring.
  • Maintain safe worksite and wash out trucks only in designated areas.
  • Protect adjacent finished work from splatter or damage.
  • Comply with structural drawings for mix design (PSI) and reinforcement.

2. Site Prep & Forming

  • Layout and excavate footings per plan dimensions and depth.
  • Install and compact gravel base (crushed stone) as specified.
  • Install vapor barrier (Visqueen/Stego) under all interior slabs.
  • Form footings, foundation walls, and slab edges true to line and grade.
  • Install keyways or dowels for cold joints.
  • Install termite treatment/barrier if required prior to pour.

3. Reinforcement (Rebar/Mesh)

  • Furnish and install steel reinforcement (rebar) per structural schedule.
  • Tie and support rebar on chairs to maintain proper clearance.
  • Install wire mesh or fiber reinforcement in slabs as specified.
  • Install all anchor bolts, hold-downs, and straps at correct locations for framers.
  • Bond/ground rebar to electrical service grounding electrode (Ufer ground).

4. Placing & Finishing

  • Pump or place concrete for footings, walls, and slabs.
  • Vibrate concrete in walls/footings to consolidate and prevent honeycombing.
  • Screed, float, and trowel slabs to specified finish (Smooth, Broom, Exposed Aggregate).
  • Install control joints (saw cut or tooled) at required spacing to control cracking.
  • Apply curing compound or keep wet to ensure proper cure.
  • Slope exterior flatwork away from building for drainage (positive drainage).

5. Specific Inclusions

  • Foundation Walls / Stem Walls.
  • Slab on Grade (Basement or Garage).
  • Driveways and Aprons.
  • City Sidewalks and Approaches (per municipal standards).
  • Patios and Porch Caps.
  • Retaining Walls (if noted on plan).

6. Exclusions

  • Testing services (Slump/Cylinder tests) - paid by Owner/GC.
  • Winter conditions (heating/blankets) unless specifically agreed.
  • Surveying or staking (by GC).
  • Cosmetic sealing or staining (unless listed in finish schedule).

Export your Scope

Ready to include this in your contract?

Setting a Solid Foundation

Concrete mistakes are permanent and expensive. A detailed scope of work is your best insurance against cracking, poor drainage, and structural issues.

Critical Concrete Details

"The most important part of the building is the part you'll never see againβ€”the foundation."